An ISO 9001 : 2000 & ISO 14001 : 2004 Certified Organsiation
Home About Us Contact Us
Department
Tenders
Scrap Auctions
Loco History
Material
Vendor Directory
New Projects
Tender Awarded
ISO
Railway Board Tender
Financial Review
Products Range
Right To Information
Training Calender
How To Reach
Explore Patiala
Discussion Board
Recent Events
Recruitment
Appointment
Registration
Vigilance
Bill Payment
holiday
 
ABOUT US

DMW was set up in 1981 with the assistance of World Bank. At that time Industries in India were not fully developed to manufacture diesel engine precision components to carry out the remanufacturing of various traction machines & engine blocks. DMW started the components manufacturing in 1986 along with the remanufacturing of traction machines & engine blocks. Need was also felt for rebuilding of locomotives to enhance performance of locomotives by incorporating latest technological upgradations and all RDSO modifications. It was expected that with the rebuilding of locos after 18 years, the locos would become fuel efficient, shall haul heavier loads and shall be fitted with latest modern less maintenance intensive sub-assemblies and assemblies. Accordingly the rebuilding was started in DMW in 1989. The shops which were set up for component manufacturing and remanufacturing of traction machines and engine blocks are under Phase-I of the project. The major shops in Phase-I are:

  • Shops set up under Phase-I of the project are called manufacturing shops  are mine
  • Light Machine Shop
  • Heat Treatment Shop
  • Traction Machine Shop
  • Heavy Machine Shop
  • Cylinder Liner Shop
  • Carbon Brush Shop
  • Plant Maintenance Shops
  • Tool Room, Main Receiving Station and other support facilities

Shops which came up in Phase-II i.e. when the facilities were being created for rebuilding of locomotives are under Phase-II and the shops are:

    • Shops set up under Phase-II of the project are called Rebuilding shops
  • Loco Rebuilding Shop
  • Power Pack Shop
  • Bogie Shop
  • Transmission Repair Shop
  • Air Brake & Pipe Shop
  • Loco Test & Paint Facilities

 


Salient Features of DMW

 

  • Workshop area (m2)

837936

  • Covered area in shops (m2)

87578

  • Township area (m2)

1416800

  • Electrical Energy Consumption (lacs of units/year)

161.01

  • Total staff quarters

Type-I    
Type-II
Type-III
Type-IV
Type-IV (Special)
Type-V/VI         

 

318
954
274
86
64
53

  • A residential township has 1749 quarters spread over 350 acres.
  • A 9-hole golf course spread over 34 acres.
  • Township is self sufficient in all basic amenities such as Hospital, School, Shopping Centres, Bank, Post Office, Recreational and Sports facilities.
  • No of beds in hospital                                                                   30
  • Total workforce

                                                                      Sanctioned                   On roll
              (i)   Group - A&B                                  104                              90           
              (ii)  Group - C&D                                 4018                           3643                                                                                   
                                                                           _______                   _______
                        Total                                             4122                           3733

Machinery & Plant

DMW has large number of sophisticated machines including more than 70 CNC machines. Number of shopwise available machines in DMW is attached as Annexure 'A'.

DMW Product Profile

DMW is engaged to manufacture various diesel components along with rebuilding of diesel electric locomotives and power packs. The activities & products are given below:

  • Mid life rebuilding/ reconditioning of WDM2 ALCO locomotive. Upgrading them from 2600HP to 3100HP and 3300 HP.
  • Incorporating various modifications to enhance the efficiency, reliability, safety of locomotive.
  • Manufacture of various type of carbon brushes used on traction machines of WDM2, WDM3A, YDM4, WDG4, WDM3C, DMU.
  • DMW can undertake rebuilding of other ALCO locos received.
  • Rewinding/ reconditioning of traction motors, traction generator & traction alternators of locomotives.
  • Reconditioning of engine block of ALCO locomotives.
  • Reconditioning of power pack.
  • Reconditioning of CO-CO Bogies.
  • Manufacturing components for the above mentioned sub-assemblies.
  • The components used for these locos which are purchased from trade can also be supplied.
  • Various items of meter gauge locos such as YDM4 are also manufactured & supplied.

QUALITY AND ENVIRONMENT MANAGEMENT SYSTEM
Quality Management System (ISO-9001:2000)

    • DMW has been certified for Quality Management System by M/s Bureau of Indian Standards, Chandigarh since 10.05.2005
    • The First Surveillance Audit was successfully conducted on 8-9th Feb, 2006.

Environment Management System (ISO-14001:2004)

    • Implementation of Environment Management System is under process and it is expected to achieve ISO-14001 certification by June 2006.

DMW Production
Production in Money Value

                                                                                                               (Figures in Cr.)

YEAR

PHASE-I
(Manufacturing)

PHASE-II
(Rebuilding)

 

Target

Actual

Target

Actual

2003-04

112.3

120.0

164.2

178.3

2004-05       

122.3

126.3

162.6

184.7

2005-06
(Upto Feb.'06)

124.4

131.1

176.6

171.0

 

Achievements of Last 07 Years

DMW Production in numbers & money value

Year

No.of Locos rebuilt

Number of subassemblies remanufactured

Value of items manufacted in LMS                           (in Cr. of Rs.)

Number of Carbon Brushes produced        (In Lacs )

Power packs

Engine Blocks

TM Armature

TG Armature

Cylinder Liners

1999-00

70

82

120

780

134

7068

39.4

5.2

2000-01

64

76

126

800

156

7976

41.8

5.5

2001-02

63

79

123

871

121

7826

40.8

5.9

2002-03

73

79

121

848

110

8047

45.8

5.9

2003-04

73

85

127

864

124

8004

46.4

5.2

2004-05

74

87

132

864

125

8402

51.2

5.3

2005-06
(Upto Feb 2006)

66

81

147

785

128

7658

55.3

5.5

 

 

 

 

 

 

 

Targets for 2006-07 & 2007-08

Item

Targets

2006-07

2007-08

Loco Rebuilding

84

96

Power Packs

12+18

12+24

Engine Blocks

172

184

Cylinder Liners

9100

10,000

Carbon Brush

6,00,000

6,25,000

Tr. Motor Assy

800

975

TM Magnet Frame

920

1100

Traction Alternator

48

36

TMS (value in Cr.)

57.95

59.89

LMS (value in Cr.)

70

80

Phase-I shops

165.53

174.85

Phase-II shops

218.86

237.13

Technical Courses
Refresher Course

    • Training needs for staff for 2005-06 have been identified as per the arising.
    • 98% of the staff have already been trained till Feb., 2006.
    • 52 Refresher Courses were planned in 2005-06 and till Feb.'06, 51 Refresher Courses have been conducted.

            CNC Courses

    • 06 courses have been conducted during 2005-06.
    • Till date 47 artisans and 37 supervisors of Zonal Railways have been trained during 2005-06
    • Training Calendar for 2006-07 has been issued to Zonal Railways for calling nominations.

            Course on maintenance of In Motion Electronic Weigh Bridge

    • 01 course was conducted in 2005-06, in which 14 staff attended the course.
    • 03 courses have been planned for 2006-07 considering the pace at which weighing bridges are being installed over Zonal Railways.

Shopwise distribution of machines:

Shop

No. of machines

TTC

16

Depot

15

Lab

26

General Pool

13

Crane

11

ABS

26

BS

49

CBS

37

CLS

41

CMS

36

CS

18

Electronic Lab

76

ERS

08

HMS

71

HTS

28

Inspection

03

LMS

207

LRS

58

LTS

02

PMS

31

PPS

106

SSS

38

TMS

113

TR

51

TRS

45

TOTAL

1125


Diesel Loco Modernisation Work, Patiala (Earlier known as Diesel Component Works, Patiala) was established in 1981. It has come in two phases under different estimates.

Phase-I was established for the following activities

  1. Manufacturing of new components such as carbon brushes, Annexure 'N' items.
  2. Remanufacturing of sub-assemblies, engine block, traction machines, cylinder liners.

 

The following shops came up in Phase-I

Manufacturing / rehabilitation shops

  1. Carbon Brush Shop
  2. Light Machine Shop
  3. Heat Treatment Shop
  4. Traction machine Shop
  5. Heavy Machine Shop
  6. Cylinder Liner Shop

 

Support Shops

  1. Plant Maintenance shop
  2. Tool Room
  3. Chemical Laboratory
  4. Store Depot Phase-I

 

Other Facilities

  1. Township
  2. Administrative Building
  3. Hospital

 

As these facilities came up under one estimate called Phase-I. The phase-I shops were commissioned in year 1985 to 1987.

Phase-II

The Power Pack Assembly and Loco Rebuilding facilities were generated as Phase-II under separate estimate. The following shops came up as the part of Phase-II

Manufacturing shops

  1. Power Pack Shop
  2. Bogie Shop
  3. Loco Rebuilding Shop
  4. Air Break Shop
  5. Super Structure Shop
  6. Transmission Shop

 

Support Depot

            Store Depot Phase-II

The shops have started production gradually from the year 1989.

 

 
    Home           Disclaimer          Site Map           Contact Us